
Zhangjiagang City Saibo Science & Technology Co.,Ltd
Zhangjiagang City Saibo Science & Technology Co.,Ltd future by heartiness, faith lead to the world 123th China Import and Export Fair (Canton Fair),the time is from 15th to 19th April,2018, our booth
Add to Cart
Metal Tray Production Line
1. Profile drawing:
Size 1: 50x50mm
Size2: 600x50/80/100mm
Size3: cover
No | Specification of the material | |
1 | Suitable Material | Zink Steel, 0.55-1.5mm, steel grade: 220-320Mpa Stainless steel ,0.55mm-0.8 mm |
2 | Width of the raw material | ≤850 mm |
3 | Thickness | Zink Steel, 0.55-1.5mm Stainless steel ,0.55mm-0.8 mm |
2. Machine Detailed Parameters:
1 | Machine structure | Wire electrode cutting structure |
2 | Change size | By hand wheel |
3 | Total power | Main Power: 15KW Hydraulic Power: 5.5kw |
4 | Roller stations | About 21 stations |
5 | Forming speed | 0-15m/min |
6 | Drive system | By Chain |
7 | Diameter of shaft | ¢70mm solid shaft |
8 | Voltage | 380V 50Hz 3phases |
3. The Chart of Process Flow
5T hydraulic de-coiler—flatten—servo feeding& Punching—Servo Feeding& punching& cutting—motorized conveyor—roll forming—out table
4. Specification of Components
No | Technical Specification & Remark | |
1 | 5T Hydraulic un-coiler |
|
2 | Flatten |
|
3 | Servo feeding& punching machine | Servo machine:
Punching machine: Description:
Technology details of punching machine:
|
4 | Servo feeding& hydraulic punching& cutting |
|
5 | Motorized conveyor |
|
6 | Main roll forming machine |
|
7 | Machine structure: |
|
8 | Hydraulic System |
|
9 | Computer Control Cabinet
|
|
10 | Out table |
|
11 | Spare Parts |
|
5. Packing & Delivery
6. Warranty
1: Guaranteed against malfunctions due to manufacturing defects for 1 year after date of shipment. Repairs will be made free of charge.
2: Repairs will not be performed free of change even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
3: Air ticket, transportation cost, hotel, meals and 100USD per day shall be for purchaser’s account if manufacturer’s engineer has to be for installation new machine.
7. Payment Term
30% deposit by T/T in advance and 70% balance after inspection confirmation before shipment