Zhangjiagang City Saibo Science & Technology Co.,Ltd

Zhangjiagang City Saibo Science & Technology Co.,Ltd future by heartiness, faith lead to the world 123th China Import and Export Fair (Canton Fair),the time is from 15th to 19th April,2018, our booth

Manufacturer from China
Verified Supplier
9 Years
Home / Products / Cold Roll Forming Machine /

Automatically 90 Degree Hat Roll Forming Machine With Servo Feeding And Punching

Contact Now
Zhangjiagang City Saibo Science & Technology Co.,Ltd
Visit Website
Province/State:jiangsu
Country/Region:china
Contact Person:MsNancy
Contact Now

Automatically 90 Degree Hat Roll Forming Machine With Servo Feeding And Punching

Ask Latest Price
Video Channel
Brand Name :Saibo
Model Number :P Type Tube
Certification :CE/IS09001/SGS
Place of Origin :China
MOQ :1 set
Payment Terms :L/C, T/T, Western Union
Supply Ability :200 sets per year
Delivery Time :60 working days after received deposit
Packaging Details :Suitable for ocean shipment
Product Name :Hat roll forming machine
Steel thickness :0.8-2.5mm
Material :HR, CR, Mild steel
Roller material :CR12 with chrome, HRC58-62
Station :About 22 stations
Drive :Gear box
Total power :About 65KW
Diameter of shaft :70mm, 40CR tempering
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Hat Roll Forming Machine with Fly Saw Track Cutting

Profile:

1. Coil width: Acording to the customer request

2. Thickness: 0.8-2.5mm, HR, CR, Mild steel

Automatically 90 Degree Hat Roll Forming Machine With Servo Feeding And Punching

Layout

3T Double head hydraulic decoiler-----Leveling----- Servo feeding and punching------Roll forming-----Track cutting-----Final pro

Specifications:

Item NO

Description

Offered specification

1 Roll Forming Machine

Hat Roll Forming Machine

2 Material Width According to the final product
3 Rolling Speed 25m/min(not include cutting & punching time)
4 Rolling Thickness 0.8-2.5mm
5 Control System PLC (Panasonic) as list in the note
6 Un Coiler 3 ton double head hydraulic de-coiler
7 Roller Stations 22 stations (according the final design)
8 Roller Material

CR12, HRC58-62℃

coated with chrome

9 Shaft Material and DIA ¢70mm, material is 45# forge steel
10 Maim Motor Power 18.5kw
11 Cutting Power 7.5kw with cooling system
12 Servo track power 4.4kw
13 Material Of Cutting Cr12 quenching 58-62℃
14 Structure Of The Stations Wire electrode cutting
15 Tolerance 3m+-1.5mm
16 Electric Source

415V, 50HZ,3 phase

According to customer’s require

17 Way Of Drive By gearbox
18 Color Of The Machine Yellow and blue
19 Container Need 2 x40 feet

Picutres for reference

Automatically 90 Degree Hat Roll Forming Machine With Servo Feeding And Punching

Automatically 90 Degree Hat Roll Forming Machine With Servo Feeding And Punching

Automatically 90 Degree Hat Roll Forming Machine With Servo Feeding And Punching

Main Features

1.The control system is equipped with a PLC (Programmable Logic Controller) that allows for easy operation and precise control of the production process. This advanced system also ensures high efficiency and accuracy, reducing the risk of errors and increasing the overall productivity of the machine.

2.Shear Blade Material: Cr12
3. All die punches are designed to be easily replaced/removed/repaired

4. Simple structure in linear type ,easy in installation and maintenance.

5. Adopting advanced world famous brand components in pneumatic parts, electric parts and operation parts.

6. Running in a high automatization and intellectualization, no pollution

7. No need foundation, easy operation

Warranty

Warranty: 1 year warranty from date of shipment
Guarantee:

1: Guaranteed against malfunctions due to manufacturing defects for 1 year after date of shipment. Repairs will be made free of charge.

2: Repairs will not be performed free of change even during the guarantee period in the follow circumstances

- Damage occurs due to a natural disaster

- Malfunction occurs due to user error

- Malfunction occurs due to modifications

- Malfunction occurs due to further movement or shipment after installation

3:Air ticket, transportation cost, hotel, meals and 100$ per day shall be for purchaser’s account if manufacturer’s engineer has to be send to purchaser’s factory to maintain the machine during the guarantee period.

Inquiry Cart 0